|
Specie of the Month:
Brazilian Cherry (Jatoba) Staybull Flooring™ |
|
|||||||||||||||
Staybull Flooring™ - Installation InstructionsInstallation Preparation InstructionsRead the entire instructions before starting your project. ![]() 1) INSPECT EACH PLANK (see fig. a) We urge you to inspect for color, finish and grain BEFORE installation. Care should be taken during the installation process to cut out characteristics that you do not desire. We suggest you use cut planks as pieces to begin each new row and to ‘rack’ the flooring, staggering joints at a minimum of 6 inches apart to ensure a random appearance.
![]() 2) SUB FLOOR PREPARATION (see fig. b & c)
a. If the underlayment substrate plywood is less than 3/4” thick or is a wood product other than plywood, add a second cross layer for strength and stability not less than 5/16” thick. To prevent squeaking, use ring shank nails, coated nails or coated staples every 6” to secure the second layer. Glue (construction adhesive) and screw down plywood, when installing any added layers of plywood to the subfloor. Wood product subflooring should be covered with a layer of felt roofing paper or Red Rosin Paper prior to nailing flooring down. Structurally sound wood floors should not have movement or deflections. Subfloor movement or improper subfloor installation may eventually cause squeaking. High moisture content of subflooring or concrete slabs may cause cupping, twisting, and other problems in the finished hardwood flooring. Excessive moisture of the subfloor is the leading cause of any wood flooring problems, so be sure to only install wood flooring over adequately dried subflooring and well cured slabs. A dehumidifier used for several days in the installation area prior to bringing flooring in to acclimate will help to remove excess moisture. Ensure that any basement or crawl space under flooring area is adequately dry as not to add moisture issues to the flooring area.
3) BLENDING OF CARTONS PLEASE NOTE: Staybull Flooring manufacturers, agents, reps, distributors, retailers, and other related parties accept no responsibility for costs incurred when a floor with visible defects has been permanently installed or when installation instructions are not properly followed. Defects should be culled from flooring prior to installation. Please keep in mind that it is always a good idea to retain a few planks in case a repair is ever required. Preparing Doorways and Skirting 2. Undercut all door casings 3mm (approx. 1/8”) higher than the thickness of the flooring to be installed. Put a scrap piece of plank on the substrate as a guide and cut the door casing with a handsaw or power undercut saw set to the correct height. Step by step installation instructions:Over Concrete Subfloor OR Over Plywood Subfloor
|
||||||||||||||||
|
||||||||||||||||